culture-white-1.png

Promotion of local culture and preservation of historical heritage (Thematic Objective 3)
Priority 3.1: Promoting local culture and historical heritage along with tourism functions. 

Expected result: Network of renewed cultural and historic sites (buildings and their environment and infrastructure) which forms the bases of touristic products of the programming region (thematic routes crossing the border, cultural programmes with cross border effect) with which the number of visitors can be increased in the area.
Result indicator: Increase of number of visitors of reconstructed sites (visitors). Target value: 20.000
Output indicators: Number of organisations using programme support for promoting local culture and preserving historical heritage; target value: 40; Number of improved cultural and historical sites as a direct consequence of programme support; target value: 20; Number of cross-border cultural events organised and touristic products developed using ENI support; target value: 30.

environment-white-1.png

Environmental protection, climate change mitigation and adaptation (Thematic Objective 6)
Priority 6.1: Sustainable use of the environment in the cross border area - preservation of natural resources, actions to reduce GHG emission and pollution of rivers.
Expected results: An increased capacity in the programming area to address challenges in the field of environmental protection and climate change mitigation; Successful protection of common natural values with demolishing the effects of borders on habitats and increasing the awareness of people living in the area; Improved water quality of rivers crossing the borders as a result of interventions related to waste management and waste water treatment; Increased awareness, competence and skills of renewable energy technologies and energy efficiency interventions among citizens, businesses and institutions; As a final outcome less dependency on imported energy sources in the programming area.
Result indicator: Increased capacity in environmental protection and climate change mitigation (Based on surveys (baseline, mid-term, final) among key stakeholders e.g. water directorates. relevant NGOs institutions, authorities).  Target value: based on final survey.
Output indicators: Number of persons actively participating in environmental actions and awareness raising activities; target value: 6000; Number of waste, wastewater, energy efficiency or renewable energy production interventions; target value: 30; Surface area of habitats supported in order to attain a better conservation status, ha; target value: 800.

transport-white-1.png

Improvement of accessibility to the regions, development of sustainable and climate-proof transport and communication networks and systems (Thematic Objective 7)
Priority 7.1: Development of transport infrastructure to improve the mobility of persons and goods
Expected result: Labour force and businesses become more mobile in the border region and the economic activities are increasing including the number of visitors of touristic attractions.
Result indicator: Increase of number of vehicles using the built, modernized transport and border management infrastructure (number of vehicles per day). Target value: 1000.
Output indicators: Total length of newly built roads (km); target value: 5; Total length of newly built bicycle roads and bicycle paths (km); target value: 5; Total length of reconstructed or upgraded roads (km); target value: 40; Total length of reconstructed or upgraded bicycle roads and bicycle paths (km); target value: 40; Number of public transport lines with increased service level as direct consequence of the support; target value: 4.

health-white-1.png

Common challenges in the field of safety and security (Thematic Objective 8)
Priority 8.1: Support to joint activities for the prevention of natural and man-made disasters as well as joint action during emergency situations
Expected result:
the risk of natural and man-made disasters should be decreased and the handling of such cases should be more effective with the use of new infrastructure elements, common strategies and co-operation platforms created for the programming area.
Result indicator: Risk management index (RMI) of the cross-border area. Target value: based on final survey.
Output indicators:
Number of co-operating organisations in disaster management; target value: 8;
Population benefiting from flood protection measures services as a direct consequence of the support, persons; target value: 25.000;
Population benefiting from forest fire protection measures services as a direct consequence of the support, persons; target value: 5000.

health-white-1.png

Priority 8.2: Support to the development of health
Expected results: joint prevention programmes, improved health care infrastructure and cross border institutional co-operations are foreseen to improve health conditions of citizens and reduce the risk of human epidemiology hazards crossing the border.
Result indicator: Medical equipment density (total density per million population, simple average of all measured equipment types in the four countries – HU, SK, RO, UA). Target value: 2.5.
Output indicator: Population covered by improved health services as a direct consequence of the support; target value: 178 000.